Database Design and Data Migration

Schemas that hold up over time, and safe moves between systems.
01 / Included
  1. 01Schema review or design
  2. 02Migration scripts and dry runs
  3. 03Data validation reports
  4. 04Cutover with rollback plan
02 / Delivery
  1. Step 01UnderstandWe learn the business, the users and the constraints before writing a line.
  2. Step 02DesignFlows, interfaces and architecture agreed on paper, so nothing is a surprise later.
  3. Step 03BuildShort cycles, working software every week, and code you can actually read.
  4. Step 04RunDeployed, monitored and maintained. We stay after launch.